> Shop Office > Indahmas 3
Details | Site Plan | Floorplans | Specifications | Progress
Specifications
Structure
- Reinforced concrete 
Walls
- Brickwall
Roof Tiles
- Concrete Roof Tiles
Ceiling
- Asbestos free cement board
Windows
- Aluminium frame glass window
Doors
- M.S. roller shutter / Plywood flush door / PVC door
Locks
- Quality locks
Floor Finishes
- Toilet / Bath Ceramic tiles
- Other area Cement render
Wall Tiles
- Toilet   1500mm high ceramic wall tiles
Sanitary Installation
(1-Storey)
(2-Storey)
- Wash basin 1 no 2 nos.
- Soap holder 1 no. 2 nos.
- Toilet roll holder 2 nos. 4 nos.
- Shower rose 1 no. 2 nos.
- W.C.  2 nos. (1 no. sitting, 1 no. squatting) 4 nos. (2 nos. sitting, 2 nos. squatting)
Electrical Installations
(1-Storey) (2-Storey)
Int / End Unit Std Corner Unit   Int / End Unit Std Corner Unit
- Lighting point 10 nos. 14 nos.   19 nos. 27 nos.
- Power point (13A) 6 nos. 6 nos.   12 nos. 12 nos.
- Ceiling fan point 2 nos. 2 nos.   3 nos. 3 nos.
- Telephone point 1 no. 1 no.   2 no. 2 no.
Painting
- Emulsion Paint