> Phase 9C 1 1/2 Storey Bungalows > Camino
Details
|
Site Plan
|
Floorplans
|
Specifications
|
Progress
Specifications
Structure
-
Reinforced Concrete
Wall
-
Clay Bricks
Roof Covering
-
Clay Tiles
Roof Framing
-
Proprietary Truss System
Ceiling
-
Skim Coats / Plaster Ceiling
Windows
-
Powder Coated Aluminium Framed Windows
Doors
-
Main Entrance
:
Solid Timber Decorative Door
-
Bedrooms / Kitchen
:
Solid Core Timber Door
-
Others
:
Powder Coated Aluminium Frame Folding & Sliding Door / Timber Flush Door / Timber Louvered Door / M. Steel Grill Door
Ironmongery
-
Quality Locksets
Wall Finishes
-
Kitchen
:
Ceramic Tiles
-
Master Bath
:
Ceramic Tiles
-
All Other Bath
:
Ceramic Tiles
-
Others
:
Plaster & Paint
Painting
-
Emulsion Paint Internally & Weather Resistance Paint Externally
Floor Finishes
Ground Floor
-
Living
:
Porcelain Tiles
-
Dining
:
Porcelain Tiles
-
Bedroom
:
Porcelain Tiles
-
Dry Kitchen
:
Porcelain Tiles
-
Wet Kitchen
:
Ceramic Tiles
-
Bathrooms / Powder Room
:
Ceramic Tiles
-
Dry Yard
:
Ceramic Tiles
-
Store
:
Ceramic Tiles
-
Terrace
:
Homogeneous Tiles
-
Car Porch
:
Homogeneous Tiles
-
Diveway
:
Homogeneous Tiles
-
Staircase
Timber Strips
First Floor
-
Master Bedrooms
:
Timber Strips
-
Bedroom
:
Timber Strips
-
Stores
:
Timber Strips
-
Balcony
:
Homogeneous
-
All Bathrooms
:
Ceramic Tiles
-
Other
:
Cement Render
Sanitary Wares
-
WC
5
-
Wash Basin
5
-
Shower
4
-
Kitchen Sink
2
Telephone & Electrical Installation
-
Light Point
28
-
Power Point
27
-
Air-cond Point
4
-
Instantaneous Water Heater Point
1
-
Fan Point
4
-
Telephone Point
4
-
Astro Point
3
-
TV Point
1
-
Intercom Point
1
-
Shaver Point
1
-
Bell Point
1
-
Isolator
1
Centralized Water Heater Piping
-
3 Phase Wiring
Fencing
-
1200 mm High Fencing at the Side and Back
Turfing
-
Grass
Copyright © 2008 S P Setia Bhd Group. All Rights Reserved.
Terms And Conditions
of Use.