|
 |
|
 |
 |
> Double Storey Chic Homes > The Lodge (RT2-BO-BN) |
|
|
 |
 |
| Details | Site Plan | Floorplans | Specifications | Progress |
 |
Specifications |
 |
|
| Structure |
| - |
Reinforced Concrete Framework |
|
| Walls |
|
| Roof Covering |
| - |
Metal Roof Sheet / R. C. Flat Roof |
|
| Roof Framing |
|
| Ceiling |
| - |
Skim Coat / Asbestos Free Ceiling Board / Plaster Ceiling |
|
| Windows |
| - |
Aluminium Frame Casement / Sliding / Fixed Glass Panel / Louvred / Top Hung |
|
| Doors |
| - |
Decorative / Plywood Flush / PVC / M.S. Grille / Aluminium Frame Sliding (Corner Lot Only) |
|
| Ironmongery |
|
| Wall Finishes |
| - |
Kitchen / Bathrooms |
: |
1500mm High Ceramic Wall Tiles |
|
| Floor Finishes |
| - |
Living / Dining / Kitchen / Yard |
: |
Ceramic Tiles |
| - |
Bedrooms / Bathrooms |
: |
Ceramic Tiles |
| - |
Staircase |
: |
Ceramic Tiles |
| - |
Car Porch / Driveway / Utility |
: |
Cement Render |
| - |
Other Areas |
: |
Cement Render |
|
| Sanitary and Plumbing Fittings |
| - |
Kitchen Sink |
1 no |
| - |
Wash Basin |
3 nos. |
| - |
Soap Holder |
3 nos. |
| - |
Toilet Roll Holder |
3 nos. |
| - |
Shower Rose |
3 nos. |
| - |
W.C |
3 nos. |
|
| Electrical Installations |
|
|
Std Int / Std End unit |
Std Corner Unit |
| - |
Lighting Point |
18 nos. |
19 nos. |
| - |
Power Point (13A) |
11 nos. |
11 nos. |
| - |
Fan Point |
4 nos. |
4 nos. |
| - |
TV Point |
2 nos. |
2 nos. |
| - |
Heater Point |
1 no. |
1 no. |
| - |
Aircond Point |
2 nos. |
2 nos. |
| - |
Door Bell Point |
1 nos. |
1 nos. |
|
| Internal Telephone Trunking and Cabling |
|
| Fencing |
| - |
1500mm High Brickwall with M.S Grille, M.S Gate, Refuse Chamber & Letter Box, |
|
| Turfing |
|
| Gas Piping |
|
|
|
| |
|
|
|
|
|
|
| |